Field Engineer (night shift) - Data Center Construction

United StatesUnited States·TempleOn-sitemid
EngineeringField Engineer
2 views0 saves0 applied

Quick Summary

Key Responsibilities

maintains accurate quantity logs and reports quantities in compliance with the cost control manual. Completed logs are to be filed with the project files.

Requirements Summary

Job Description is subject to change at any time and may include other duties as assigned. Physical Requirements 1. Ability to wear personal protective equipment is required (including

Technical Tools
EngineeringField Engineer

Assists the Project Engineer with being the technical source of information for the project. Responds to questions about drawings, specifications, shop drawings, and change orders and have responsibility for assisting in writing change orders, RFl's, meeting minutes, and reviewing Submittals. Maintains an effective and professional working relationship with owners, architects, engineers, subcontractors, and suppliers. This position includes three 'steps' (I, II and Senior), which provide for a progression of skill and experience. Step I is the entry level for individuals with a minimum of experience in this position. 

Responsibilities

~3 min read

1.    Assists Project Engineer in developing and maintaining as-built drawings and other work tasks and assists with or reviews and processes submittals, change orders, RFl's, and budget forecasting. Ensures the timely and appropriate generation, collection, distribution, storage, retrieval and ultimate disposition of meeting agendas, RFl's and daily reports.
2.    Demonstrates an understanding of the project management plan (PMP) and is involved in support and execution of the plan. Demonstrates a thorough understanding of the change management process and performs project scope activities and supports the project team to ensure the work needed to complete the project successfully.
3.    Ensures the administration of the project quality management plan and demonstrates and reinforces a culture of safety throughout the project.
4.    May assist in the calculation of daily production rates and unit costs for self-performed work. Participates in risk management including identification, analysis, response planning and monitoring and control on a project and demonstrates competency in understanding the environmental control processes for the project and takes corrective actions when necessary.
5.    May be responsible for overseeing/managing the BIM (Building Information Modeling) Coordination between Subcontractors and Designers.
6.    May be responsible for the documentation and submittal for the LEED (Leadership in Energy and Environmental Design) Certification of a building and for creating and updating Digital Record Drawings (ORD).
7.    May provide lines, grades and layout as required for the project while maintaining an organized logbook.
8.    May provide the following weekly quantities: maintains accurate quantity logs and reports quantities in compliance with the cost control manual. Completed logs are to be filed with the project files. Perform elements of the processes involved in budgeting and controlling costs so that the project can be completed within the approved budget. Demonstrates business acumen within area of responsibility. (Not all Field Engineers track quantities)
9.    Provides support to superintendents required for the execution of the work and assists in the resolution of field problems as necessary.

1.    Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.)
2.    May reach above shoulder heights and below the waist on a frequent basis
3.    May stoop, kneel, or bend, on an occasional basis
4.    May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors
5.    Must be able to comply with all safety standards and procedures
6.    Occasionally will climb stairs, ladders, etc.
7.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
8.    Will interact with people frequently during a shift/workday
9.    Will lift, push or pull objects on an occasional basis
10.    Will sit, stand or walk short distances for up to the entire duration of a shift/workday.

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

Location & Eligibility

Where is the job
Temple, United States
On-site at the office
Who can apply
US

Listing Details

Posted
September 21, 2026
First seen
September 22, 2026
Last seen
October 4, 2026

Posting Health

Days active
11
Repost count
0
Trust Level
25%
Scored at
October 4, 2026

Signal breakdown

freshnesssource trustcontent trustemployer trust
Newsletter

Stay ahead of the market

Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.

A
B
C
D
Join 12,000+ marketers

No spam. Unsubscribe at any time.

Field Engineer (night shift) - Data Center Construction