Senior Electrical Commissioning Project Engineer-Data Center Construction
Quick Summary
Lead the Systems That Power Critical Infrastructure At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed.
Lead the Systems That Power Critical Infrastructure
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.
This is not a checklist-driven commissioning role.
This is a position for someone who:
• Owns outcomes, not just tasks
• Understands systems holistically, not in silos
• Can operate independently while leading others
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.
Responsibilities
~1 min readRequirements
~1 min readRegular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required.
At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles.
Salary range: $130,000-$170,000 - based on experience
Location & Eligibility
Listing Details
- Posted
- August 31, 2026
- First seen
- September 25, 2026
- Last seen
- September 26, 2026
Posting Health
- Days active
- 0
- Repost count
- 0
- Trust Level
- 13%
- Scored at
- September 26, 2026
Signal breakdown
Similar Electrical jobs
View all →Stay ahead of the market
Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.
No spam. Unsubscribe at any time.