hrsi
hrsi~9h ago
New

Assistant Manager Projects

PakistanPakistan·Karachimid
OtherAssistant Manager
0 views0 saves0 applied

Quick Summary

Key Responsibilities

Develop, maintain, and update the integrated Level 1 to Level 4 project schedules in Primavera P6 (or equivalent) for all project workstreams – Dredging, 200m Expansion, Equipment / Electrical,

Technical Tools
OtherAssistant Manager

Designation: Assistant Manager Projects (Project Control / Planning)
Location:
East-Wharf Keamari Port, Karachi (On-Site)
Employment Type:
Contractual / Third-Party
Experience: Minimum 3-5 years of relevant experience
Nature of Experience: Experience in project controls / planning experience, with at least 2 years on large infrastructure, marine, port, EPC, or heavy civil capital projects in a planning or scheduling lead capacity.
Education: Minimum 16 years of education, preferably a Masters degree

JOB PURPOSE: This position is responsible for ensuring, executing, and planning all project control and scheduling activities across the project portfolio (Dredging, 200m Expansion, Equipment / Electrical works, Civils EPC, SILOS, and related workstreams), in line with ADPG project governance standards. The role develops and maintains integrated project schedules, monitors physical and earned-value progress against the baseline, identifies critical path risks and recovery actions, and provides timely planning analytics, dashboards, and reports to the Project Director and senior leadership. The Assistant Manager – Project Control (Planning) acts as the planning intelligence backbone of the project, safeguarding schedule integrity, contractual milestones, and informed decision-making throughout the project lifecycle.

AREA OF EXPERTISE: Demonstrated experience in baseline schedule development, schedule control, earned-value reporting, look-ahead planning, schedule risk analysis, and forensic delay analysis on multi-disciplinary CapEx projects. Exposure to dredging, marine works, civil EPC, mechanical / electrical equipment installation, or port / terminal expansion projects is highly preferred. Experience working under FIDIC or equivalent contract forms with PMC and contractor structures is essential.

KEY RESPONSIBILITIES:

  • Develop, maintain, and update the integrated Level 1 to Level 4 project schedules in Primavera P6 (or equivalent) for all project workstreams – Dredging, 200m Expansion, Equipment / Electrical, Civils EPC, and SILOS – in line with the approved Project Execution Plan.
  • Establish, monitor, and control the schedule baseline; ensure all schedule changes are approved, documented, and managed through the formal Change Management process.
  • Track and analyse contractor weekly and monthly progress submissions,
    validate physical progress against installed quantities, and reconcile with earned-value performance metrics (SPI, CPI, % complete, planned vs actual S-curves).
  • Identify and report critical-path activities, schedule slippages, float
    erosion, and forecast project completion dates; recommend mitigation
    and recovery actions to the Project Director.
  • Coordinate with discipline leads, PMC, and contractors to ensure
    interfaces, look-ahead schedules (3-week / 6-week), and constraint logs are aligned and actionable.
  • Prepare and issue weekly and monthly progress reports, dashboards, and management decks; ensure consistency, accuracy, and on-time
    submission.
  • Maintain the project risk-adjusted schedule, supporting risk identification, quantitative schedule risk analysis (QSRA) where applicable, and contingency / float management.
  • Support claims and Extension of Time (EOT) assessments through forensic schedule analysis, delay analysis, and impact assessments; provide planning evidence for contractual reviews.
  • Maintain the resource histograms, manpower curves, and equipment /
    plant deployment forecasts for early identification of resource bottlenecks.
  • Conduct planning reviews and audits of contractor schedules to validate logic, durations, sequencing, calendars, and constraints in line with industry best practice.
  • Champion the use of integrated project controls tools (P6, Power BI, MS
    Project, Excel-based dashboards) and continuously improve planning data quality and reporting cadence.

Only shortlisted candidates will be contacted
www.hrs-int.com

Location & Eligibility

Where is the job
Karachi, Pakistan
On-site at the office
Who can apply
PK

Listing Details

First seen
July 21, 2026
Last seen
July 21, 2026

Posting Health

Days active
0
Repost count
0
Trust Level
51%
Scored at
July 21, 2026

Signal breakdown

freshnesssource trustcontent trustemployer trust
Newsletter

Stay ahead of the market

Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.

A
B
C
D
Join 12,000+ marketers

No spam. Unsubscribe at any time.

hrsiAssistant Manager Projects