Construction Scheduler (P6 Schedules) Remote
Quick Summary
Bachelors degree in Construction Management, Engineering, or related field is preferred Minimum 3 years of experience in complex construction (Heavy Commercial, Data Centers, Industrial,
Responsibilities
~1 min read- →Lead the development of detailed project schedules along with project teams’ input
- →Collect project progress and updating project status
- →Performing impact analysis for potential delays and changes
- →Work with the project management and field teams to help set project goals and analyze the status of the project
- →Analyze the schedules to determine duration and logic issues
- →Ability to manage schedules for multiple projects and/or more complex projects, larger in size
- →Provide guidance to less experienced members of the scheduling team
- →Perform other duties as assigned
- →Travel may be necessary depending on the project needs and location
Requirements
~2 min read- Bachelors degree in Construction Management, Engineering, or related field is preferred
- Minimum 3 years of experience in complex construction (Heavy Commercial, Data Centers, Industrial, Power Generation, Specialty Contractors, Heavy Civil)
- Knowledge of critical path method of scheduling
- Strong written and oral communication skills
- Experience using CPM Primavera P6 scheduling software
- Experience with ProCore, Bluebeam, Navisworks, REVIT preferred
- Familiarity with claims prevention and analysis techniques strongly preferred
- Ability to conduct constructability reviews for varying construction method/techniques during design or construction
Work Location: Preferred to work at Mullins Mechanical office located in Carrollton, Georgia. Will consider hybrid/remote for the right Leader.
Salary: Compensation commensurate with experience.
Join Us
Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list, #48 in the Nation and #5 in the Southeast among Firms in Mechanical. We’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor specializing in design-build applications, HVAC systems, plumbing, process piping systems, boiler and chiller systems, equipment installation and rigging, plant relocation and maintenance, fire protection, and metal fabrication. Our projects are often in industrial and heavy commercial environments such as manufacturing facilities, automotive plants, chemical plants, distribution centers, warehouses, data centers, and other large facilities.
Location & Eligibility
Listing Details
- Posted
- June 16, 2026
- First seen
- July 11, 2026
- Last seen
- July 11, 2026
Posting Health
- Days active
- 0
- Repost count
- 0
- Trust Level
- 29%
- Scored at
- July 11, 2026
Signal breakdown
Please let mullins know you found this job on Jobera.
4 other jobs at mullins
View all →Explore open roles at mullins.
Similar Construction jobs
View all →Browse Similar Jobs
Stay ahead of the market
Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.
No spam. Unsubscribe at any time.