WP-Electrical & Electronics Engineering(Local-Xi'an)
Quick Summary
1. Responsible for the design and development of the hardware system of wind power converter products; electrical scheme design, device selection, cable selection; 2.
1. Bachelor degree or above, electrical engineering, automation, control theory and engineering, mechatronics or similar majors; 2. Solid professional foundation, familiar with analog electricity,
Responsibilities:
1. Responsible for the design and development of the hardware system of wind power converter products; electrical scheme design, device selection, cable selection;
2. Responsibilities include system topology selection, main power circuit design, power module design, electromagnetic components design, device selection and design, power single board design, etc., as well as electrical drawing design, cable design, product data design, etc.;
3. Complete the converter system scheme design and verification, and do system self-test and test problems solving;
4 .Responsible for comprehensively supporting the analysis and solving of various technical problems of converter products on the market, production and field sides.
Requirement:
1. Bachelor degree or above, electrical engineering, automation, control theory and engineering, mechatronics or similar majors;
2. Solid professional foundation, familiar with analog electricity, digital electricity, control theory, electrical engineering theory, electrical engineering and various power electronics circuit topology;
3. Having the development experience, been proficient in various analog and digital circuit designs, design and select power electronic devices, inductors, capacitors, resistors, various types of power distribution devices and industrial sensors. Having the design experience in EMC, lightning protection, safety, reliability and environmental suitability design;
4. Be able to apply relevant theoretical knowledge of electrical engineering, electrical engineering principles, control principles and other relevant theoretical knowledge for system-level design and optimization of wind power converter.
Location & Eligibility
Listing Details
- Posted
- June 22, 2026
- First seen
- June 22, 2026
- Last seen
- June 22, 2026
Posting Health
- Days active
- 0
- Repost count
- 0
- Trust Level
- 49%
- Scored at
- June 22, 2026
Signal breakdown
Please let Vertiv Group Corporation know you found this job on Jobera.
4 other jobs at Vertiv Group Corporation
View all →Explore open roles at Vertiv Group Corporation.
Similar Electrical jobs
View all →Browse Similar Jobs
Stay ahead of the market
Get the latest job openings, salary trends, and hiring insights delivered to your inbox every week.
No spam. Unsubscribe at any time.